Zhuhai Port Gaolan Port Area Nanshui Operation Area Spoil Shore Wall Phase I Section 1 Project
Zhuhai Port Gaolan Port Area Nanshui Operation Area Spoil Shore Wall Phase I Section 1 Project
The first section of the first phase of the spoil bank wall project in the Nanshui operation area of the Gaolan Port Area of Zhuhai Port, with a construction period of 480 days, is located in the Gaolan Port Economic Zone of Zhuhai City. The project has a designed annual throughput of 16 million tons, and after completion, the dock coastline will be 668 meters long with a storage area of 300000 square meters. It will become a specialized dry bulk wharf in the Pearl River Delta region. The total investment in the spoil bank wall project in the Nanshui operation area of the Gaolan Port Area is 2.69 billion yuan, of which the first phase investment is 900 million yuan, After completion, a shoreline resource of 8000 meters will be formed.
The first section of the first phase of the spoil bank wall project in the Nanshui operation area of the Gaolan Port Area of Zhuhai Port, with a construction period of 480 days, is located in the Gaolan Port Economic Zone of Zhuhai City. The project has a designed annual throughput of 16 million tons, and after completion, the dock coastline will be 668 meters long with a storage area of 300000 square meters. It will become a specialized dry bulk wharf in the Pearl River Delta region. The total investment in the spoil bank wall project in the Nanshui operation area of the Gaolan Port Area is 2.69 billion yuan, of which the first phase investment is 900 million yuan, After completion, a shoreline resource of 8000 meters will be formed.